跳到主要导航 跳到搜索 跳到主要内容

Voltage assignment with guaranteed probability satisfying timing constraint for real-time multiproceesor DSP

  • Meikang Qiu*
  • , Zhiping Jia
  • , Chun Xue
  • , Zili Shao
  • , Edwin H.M. Sha
  • *此作品的通讯作者
  • University of Texas at Dallas
  • Shandong University
  • Hong Kong Polytechnic University

科研成果: 期刊稿件文章同行评审

摘要

Dynamic Voltage Scaling (DVS) is one of the techniques used to obtain energy-saving in real-time DSP systems. In many DSP systems, some tasks contain conditional instructions that have different execution times for different inputs. Due to the uncertainties in execution time of these tasks, this paper models each varied execution time as a probabilistic random variable and solves the Voltage Assignment with Probability (VAP) Problem. VAP problem involves finding a voltage level to be used for each node of an date flow graph (DFG) in uniprocessor and multiprocessor DSP systems. This paper proposes two optimal algorithms, one for uniprocessor and one for multiprocessor DSP systems, to minimize the expected total energy consumption while satisfying the timing constraint with a guaranteed confidence probability. The experimental results show that our approach achieves significant energy saving than previous work. For example, our algorithm for multiprocessor achieves an average improvement of 56.1% on total energy-saving with 0.80 probability satisfying timing constraint.

源语言英语
页(从-至)55-73
页数19
期刊Journal of VLSI Signal Processing Systems for Signal, Image, and Video Technology
46
1
DOI
出版状态已出版 - 1月 2007
已对外发布

联合国可持续发展目标

此成果有助于实现下列可持续发展目标:

  1. 可持续发展目标 7 - 经济适用的清洁能源
    可持续发展目标 7 经济适用的清洁能源

指纹

探究 'Voltage assignment with guaranteed probability satisfying timing constraint for real-time multiproceesor DSP' 的科研主题。它们共同构成独一无二的指纹。

引用此