TY - JOUR
T1 - Stochastic scheduling to minimize expected maximum lateness
AU - Wu, Xianyi
AU - Zhou, Xian
PY - 2008/10/1
Y1 - 2008/10/1
N2 - This paper is concerned with the problems in scheduling a set of jobs associated with random due dates on a single machine so as to minimize the expected maximum lateness in stochastic environment. This is a difficult problem and few efforts have been reported on its solution in the literature. In this paper, we first derive a deterministic equivalent to the expected maximum lateness and then propose a dynamic programming algorithm to obtain the optimal solutions. The procedures to compute optimal solutions are initially developed in the case of deterministic processing times, and then extended to stochastic processing times following arbitrary probability distributions. Moreover, several heuristic rules are suggested to compute near-optimal solutions, which are shown to be highly efficient and accurate by computer-based experiments.
AB - This paper is concerned with the problems in scheduling a set of jobs associated with random due dates on a single machine so as to minimize the expected maximum lateness in stochastic environment. This is a difficult problem and few efforts have been reported on its solution in the literature. In this paper, we first derive a deterministic equivalent to the expected maximum lateness and then propose a dynamic programming algorithm to obtain the optimal solutions. The procedures to compute optimal solutions are initially developed in the case of deterministic processing times, and then extended to stochastic processing times following arbitrary probability distributions. Moreover, several heuristic rules are suggested to compute near-optimal solutions, which are shown to be highly efficient and accurate by computer-based experiments.
KW - Due dates
KW - Dynamic programming algorithms
KW - Expected maximum lateness
KW - Stochastic scheduling
UR - https://www.scopus.com/pages/publications/41149100125
U2 - 10.1016/j.ejor.2007.06.015
DO - 10.1016/j.ejor.2007.06.015
M3 - 文章
AN - SCOPUS:41149100125
SN - 0377-2217
VL - 190
SP - 103
EP - 115
JO - European Journal of Operational Research
JF - European Journal of Operational Research
IS - 1
ER -