TY - JOUR
T1 - Risk-Tolerant On-Site Dispatch for Autonomous Mining Truck Fleets With Uncertain Failure Signs
AU - Sun, Rentao
AU - Yu, Guizhen
AU - Zhou, Bin
AU - Chen, Peng
AU - Li, Bai
N1 - Publisher Copyright:
© 2000-2011 IEEE.
PY - 2026/5/1
Y1 - 2026/5/1
N2 - This study proposes a risk-tolerant dispatch approach for a fleet of autonomous mining trucks in an open-pit mine, leveraging early signs to reduce the impact of potential failures that may or may not occur later. Unlike traditional methods that ignore these early signs or wait until a failure has actually happened, our approach proactively plans for both possible outcomes without relying on probabilities. We propose a Y-shaped solution structure composed of a shared trunk that covers the period before it becomes clear if the failure will occur and two separate branches that address the final scenarios. We formulate the dispatch problem as a mixed-integer linear program and solve it via Gurobi. To facilitate the solution process with Gurobi, an evolutionary algorithm is adopted to explore the solution space for a good initial guess. A high-performance discrete-event simulator is embedded in the cost function evaluation module of the evolutionary algorithm for quickly selecting qualified solution candidates. By integrating both the failure and non-failure scenarios into one unified plan, we avoid extreme risk-taking or undue conservatism, ensuring stable operational performance. Simulations and field trials at a real open-pit mine confirm that this risk-tolerant approach effectively manages failure risks when early signs are available.
AB - This study proposes a risk-tolerant dispatch approach for a fleet of autonomous mining trucks in an open-pit mine, leveraging early signs to reduce the impact of potential failures that may or may not occur later. Unlike traditional methods that ignore these early signs or wait until a failure has actually happened, our approach proactively plans for both possible outcomes without relying on probabilities. We propose a Y-shaped solution structure composed of a shared trunk that covers the period before it becomes clear if the failure will occur and two separate branches that address the final scenarios. We formulate the dispatch problem as a mixed-integer linear program and solve it via Gurobi. To facilitate the solution process with Gurobi, an evolutionary algorithm is adopted to explore the solution space for a good initial guess. A high-performance discrete-event simulator is embedded in the cost function evaluation module of the evolutionary algorithm for quickly selecting qualified solution candidates. By integrating both the failure and non-failure scenarios into one unified plan, we avoid extreme risk-taking or undue conservatism, ensuring stable operational performance. Simulations and field trials at a real open-pit mine confirm that this risk-tolerant approach effectively manages failure risks when early signs are available.
KW - autonomous mining truck
KW - contingency planning
KW - fleet management
KW - mixed-integer linear program
KW - Risk-tolerant dispatch
UR - https://www.scopus.com/pages/publications/105029182209
U2 - 10.1109/TITS.2026.3655688
DO - 10.1109/TITS.2026.3655688
M3 - 文章
AN - SCOPUS:105029182209
SN - 1524-9050
VL - 27
SP - 5454
EP - 5466
JO - IEEE Transactions on Intelligent Transportation Systems
JF - IEEE Transactions on Intelligent Transportation Systems
IS - 5
ER -