Hydrological adjustment and flooding control of wetlands in the Liaohe Delta

  • Du ning Xiao*
  • , Xian li Wang
  • , Xiu zhen Li
  • , Tie fan Pei
  • , Yi Zhao
  • *此作品的通讯作者

科研成果: 期刊稿件文章同行评审

摘要

The function of estuary wetland on hydrological adjustment and flooding control is studied in this paper. It is estimated that the evapotranspiration in the reed field during growth season(June to October) is 722.9 mm, which is 37.5 % higher than large water body(E601 : 525.9 mm). The water replacement rate in the reed field can reach 95 % only when the rains continuously for 11 days and the precipitation reached 912 mm. For the water balance in the paddy field, the total water requirement ranges between 1920 and 1860 mm, among which, 31 % is from precipitation, and the left is provided by reservoirs. The water usage efficiency is 0.35 at present productivity. Based on the landscape characteristics and functionalities on flooding control, 5 functional zones are designed for the Liaohe Delta: key protected area: underground storage area; flooding discharge area; flood diversion area in emergency ; and flood control drainage area.

源语言英语
页(从-至)146-151
页数6
期刊Journal of Environmental Sciences (China)
15
2
出版状态已出版 - 3月 2003
已对外发布

指纹

探究 'Hydrological adjustment and flooding control of wetlands in the Liaohe Delta' 的科研主题。它们共同构成独一无二的指纹。

引用此