跳到主要导航 跳到搜索 跳到主要内容

Delay analysis of structural real-time workload

  • Nan Guan
  • , Yue Tang
  • , Yang Wang
  • , Wang Yi
  • Northeastern University China
  • Uppsala University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

In many complex embedded systems, real-time workload is generated conforming certain structural constraints. In this paper we study how to analyze the delay of real-time workloads of which the generation pattern can be modeled by task graph models. We first show that directly combining path abstraction technique (PAT) in real-time scheduling theory and real-time calculus (RTC) can provide safe delay bounds, but the results are typically over-pessimistic. Then we propose new algorithms to efficiently and precisely solve the delay analysis problem. Experiments with randomly generated task systems are conducted to evaluate the performance of the proposed methods.

源语言英语
主期刊名Proceedings of the 2015 Design, Automation and Test in Europe Conference and Exhibition, DATE 2015
出版商Institute of Electrical and Electronics Engineers Inc.
223-228
页数6
ISBN(电子版)9783981537048
DOI
出版状态已出版 - 22 4月 2015
已对外发布
活动2015 Design, Automation and Test in Europe Conference and Exhibition, DATE 2015 - Grenoble, 法国
期限: 9 3月 201513 3月 2015

出版系列

姓名Proceedings -Design, Automation and Test in Europe, DATE
2015-April
ISSN(印刷版)1530-1591

会议

会议2015 Design, Automation and Test in Europe Conference and Exhibition, DATE 2015
国家/地区法国
Grenoble
时期9/03/1513/03/15

指纹

探究 'Delay analysis of structural real-time workload' 的科研主题。它们共同构成独一无二的指纹。

引用此