跳到主要导航 跳到搜索 跳到主要内容

A Flow-Grained End-to-End Delay Analysis for RC Traffic in TTEthernet

  • University of Science and Technology of China

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

Real-time domains, such as aerospace, industrial automation, and automotive systems show an increasing demand for deterministic communication behaviors. TTEthernet standard has been specifically designed for highly available real-time applications and cyber-physical systems. By introducing the time-triggered mechanism, the TTEthernet tends to improve the time determinism of real-time communications in these systems. However, non-determinism, caused by the event-triggered traffic, still exists in rate-constrained (RC) flows, thus end-to-end communication delay analysis for RC traffic in TTEthernet is indispensable. In this paper, we propose a novel method, named FWA (Flow-grained Worst-case end-to-end delay Analysis), to deal with the worst-case end-to-end delay analysis for RC traffic in TTEthernet. The derived formulas are sensitive to time-triggered flows and static schedules, and support all the three integration policies in TTEthernet. The evaluations of our proposed method demonstrate that FWA can reduce pessimism and apply to industrial configurations, compared with alternative approaches including Network Calculus and Trajectory Approach.

源语言英语
主期刊名Proceedings - 2018 IEEE 42nd Annual Computer Software and Applications Conference, COMPSAC 2018
编辑Chung-Horng Lung, Thomas Conte, Ling Liu, Toyokazu Akiyama, Kamrul Hasan, Edmundo Tovar, Hiroki Takakura, William Claycomb, Stelvio Cimato, Ji-Jiang Yang, Zhiyong Zhang, Sheikh Iqbal Ahamed, Sorel Reisman, Claudio Demartini, Motonori Nakamura
出版商IEEE Computer Society
904-913
页数10
ISBN(电子版)9781538626665
DOI
出版状态已出版 - 8 6月 2018
已对外发布
活动42nd IEEE Computer Software and Applications Conference, COMPSAC 2018 - Tokyo, 日本
期限: 23 7月 201827 7月 2018

出版系列

姓名Proceedings - International Computer Software and Applications Conference
1
ISSN(印刷版)0730-3157

会议

会议42nd IEEE Computer Software and Applications Conference, COMPSAC 2018
国家/地区日本
Tokyo
时期23/07/1827/07/18

学术指纹

探究 'A Flow-Grained End-to-End Delay Analysis for RC Traffic in TTEthernet' 的科研主题。它们共同构成独一无二的学术指纹。

引用此