跳到主要导航 跳到搜索 跳到主要内容

长江口横沙通道近岸冲刷地貌形成机制

  • Kai Hua
  • , Heqin Cheng*
  • , Shuwei Zheng
  • *此作品的通讯作者
  • East China Normal University
  • Institute of Eco-Chongming (IEC)
  • Shandong Normal University

科研成果: 期刊稿件文章同行评审

摘要

The intense erosion of a near-shore riverbed is one of the main factors for the slope failure of a bank. During a detailed investigation carried out in August 2017 and May 2018 of underwater topography of the Yangtze Estuary, a large scour pit was recognized near the shore of the Hengsha passage. The morphological and geometrical parameters of the scour pit were measured using the SeaBat7125 multi-beam system. Dual-frequency ADCP was used to collect hydrodynamic data near the scour pit. Further, a historic nautical chart was digitalized to analyze the evolution and formation mechanism of the scour pit. The results indicated that the scour pit is in the shape of an oval, with a length and width of around 430 m and 150 m, respectively; the deepest point is approximately 38 m below the surrounding riverbed. Since the formation of the -20 m isobaths line in 1992, the scour pit area has been expanding continuously, and the average depth has been increasing yearly; in particular, after 2005, the depth increased sharply. From 1984 to 2017, the riverbed around the scour pit underwent the process of erosion-silting-erosion. In the 33 years, the scouring amount is 3.45×107 m3, and the average scouring depth is 4.68 m. The ebb tide from the North Channel flows into the Hengsha passage, forming a circulation flow, thereby eroding the channel near the west bank of the Hengsha island and forming a scour pit. After 2005, the scour pit grew rapidly and expanded southward. This is mainly because the reclamation engineering performed in North Changxing reduced the curvature radius of the bend that resulted in intensified erosion. The reservoir construction engineering performed in Qingcaosha moved the thalweg in the upper and middle sections of the North Channel, and the northward entrance of the Hengsha passage expanded owing to the ebb current, which is also one of the main reasons for rapid erosion. In addition, the construction of reclamation and deep-water channel projects in the vicinity has contributed to the erosion of the channel bed, thereby accelerating the expansion of the scour pit. It can be seen that human engineering activities are the main driving factors for the rapid development of large scour pits in the Changjiang Estuary.

投稿的翻译标题Formation mechanism of near-shore erosional topography in the Hengsha passage of the Yangtze Estuary
源语言繁体中文
页(从-至)1363-1373
页数11
期刊Dili Xuebao/Acta Geographica Sinica
74
7
DOI
出版状态已出版 - 25 7月 2019
已对外发布

关键词

  • Erosional topography
  • Hengsha passage
  • Human activity
  • Multi-beam sounding system
  • The Yangtze Estuary

学术指纹

探究 '长江口横沙通道近岸冲刷地貌形成机制' 的科研主题。它们共同构成独一无二的学术指纹。

引用此