On the performance of two-sided control charts for short production runs

Research output: Contribution to journalArticlepeer-review

17 Scopus citations

Abstract

In this paper, statistical performance measures for short-run production are summarized and proposed. Evaluation and computation based on these performance measures were developed for the two-sided Shewhart, cumulative sum, and exponentially weighted moving average control charts. Applying these measures, we provided numerical illustrations to compare the efficiency of the three charts and the corresponding Q charts in the cases of known and unknown nominal values of process parameters.

Original languageEnglish
Pages (from-to)215-232
Number of pages18
JournalQuality and Reliability Engineering International
Volume28
Issue number2
DOIs
StatePublished - Mar 2012

Keywords

  • average number of false alarms
  • average run length for signal
  • probability of getting a signal
  • short production
  • truncated average run length

Fingerprint

Dive into the research topics of 'On the performance of two-sided control charts for short production runs'. Together they form a unique fingerprint.

Cite this