Abstract
To realize the dynamic scheduling of product development, a scheduling method based on Activity and its Process (ProA) hierarchical decomposition was presented integrating with product development process modeling. ProA Input and Output Item (ProA Item) and the ProA conversion operations were firstly studied. Time attributes of ProA were discussed and analyzed in detail, and rules for time attributes of ProA were also formulated. Furthermore, a polychromatic sets recurrence element model of product development scheduling was constructed. Finally, the method of the dynamic scheduling was presented, and simulation based on Matlab environments was also conducted.
| Original language | English |
|---|---|
| Pages (from-to) | 1489-1495 |
| Number of pages | 7 |
| Journal | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| Volume | 14 |
| Issue number | 8 |
| State | Published - Aug 2008 |
| Externally published | Yes |
Keywords
- Activity and its process
- Computer simulation
- Polychromatic sets
- Product development
- Recurrence element model
- Scheduling
Fingerprint
Dive into the research topics of 'Method of product development scheduling based on ProA hierarchical decomposition'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver