Skip to main navigation Skip to search Skip to main content

Loop scheduling for minimizing schedule length and switching activities

  • University of Texas at Dallas
  • Silpakorn University

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

Abstract

Switching activity is one of the most important factors in power dissipation. This paper studies the scheduling problem that minimizes both schedule length and switching activities for applications with loops. We show that to find a schedule that has the minimal switching activities among all minimum-latency schedules with or without resource constraints is NP-complete. Although the minimum latency scheduling problem is polynomial-time solvable if there is no resource constraints or only one function unit, the problem becomes NP-complete when considering switching activities as the second constraint. An algorithm, Power Reduction Rotation Scheduling (PRRS), is proposed. The algorithm attempts to minimize both switching activities and schedule length while performing scheduling and allocation simultaneously. The experimental results show that our algorithm produces effective schedules that give the switching activities 58.5% less compared to the traditional rotation scheduling on average. Our algorithm also shows better performance than the approach that considers scheduling and allocation at the separate phases.

Original languageEnglish
Title of host publicationProceedings of the 2003 IEEE International Symposium on Circuits and Systems, ISCAS 2003
PublisherInstitute of Electrical and Electronics Engineers Inc.
PagesV109-V112
ISBN (Print)0780377613
StatePublished - 2003
Externally publishedYes
Event2003 IEEE International Symposium on Circuits and Systems, ISCAS 2003 - Bangkok, Thailand
Duration: 25 May 2003 → 28 May 2003

Publication series

NameProceedings - IEEE International Symposium on Circuits and Systems
Volume5
ISSN (Print)0271-4310

Conference

Conference2003 IEEE International Symposium on Circuits and Systems, ISCAS 2003
Country/TerritoryThailand
CityBangkok
Period25/05/03 → 28/05/03

Fingerprint

Dive into the research topics of 'Loop scheduling for minimizing schedule length and switching activities'. Together they form a unique fingerprint.

Cite this