Abstract

The function of estuary wetland on hydrological adjustment and flooding control is studied in this paper. It is estimated that the evapotranspiration in the reed field during growth season(June to October) is 722.9 mm, which is 37.5 % higher than large water body(E601 : 525.9 mm). The water replacement rate in the reed field can reach 95 % only when the rains continuously for 11 days and the precipitation reached 912 mm. For the water balance in the paddy field, the total water requirement ranges between 1920 and 1860 mm, among which, 31 % is from precipitation, and the left is provided by reservoirs. The water usage efficiency is 0.35 at present productivity. Based on the landscape characteristics and functionalities on flooding control, 5 functional zones are designed for the Liaohe Delta: key protected area: underground storage area; flooding discharge area; flood diversion area in emergency ; and flood control drainage area.

Original languageEnglish
Pages (from-to)146-151
Number of pages6
JournalJournal of Environmental Sciences (China)
Volume15
Issue number2
StatePublished - Mar 2003
Externally publishedYes

Keywords

  • Flood control
  • Hydrological adjustment
  • Landscape planning
  • Water balance
  • Water replacement

Fingerprint

Dive into the research topics of 'Hydrological adjustment and flooding control of wetlands in the Liaohe Delta'. Together they form a unique fingerprint.

Cite this